Education
Health
Leisure

Tonbridge Pool

January 1996

The project that SPACE & PLACE undertook in 1996 at Tonbridge School was to design and create the 25m indoor pool.

Following on from this successful project, S&P was appointed for the refurbishment of the existing Marbeline outdoor pool at Tonbridge School, which was completed in March 2006. Outdoor swimming at Tonbridge has a long history with the original heated outdoor pool being built in 1910.

The 20m x 4 lane main outdoor pool, open April to September, is heated to provide an enjoyable swim whatever the weather. The project added an interactive water feature, relaxation zone, beach area for families, a ‘swim through’ feature to the adjacent indoor pools and a refreshment kiosk.