Bognor Seafront
December 2018
S&P delivered the seafront vision masterplan for Bognor Regis. The first components of the plan to be delivered are the rest room amenities, including modular toilets. The modular buildings are being manufactured off-site to avoid any delays caused by British coastal winter weather and also to improve quality control. This means that installation time on-site is reduced to approximately one week, ensuring that the facilities will be open for the beginning of the 2019 season.
The toilet block contains standard toilet units, urinals and a fully accessible unit with baby changing facilities and whilst the council’s policy is for free access the locking systems can be modified for coin operation plus the ability to remotely monitor use and control the locking mechanism. All equipment is designed to withstand the rigours of regular public use with a rear service zone containing the more vulnerable equipment, which also facilitates maintenance and storage of cleaning equipment.